CNG Dispensers
In 2015 APLMF agreed to summarise the test procedures used in each APLMF training course and then to survey its members to validate the test procedures and to provide some quality control. The validated test procedures will be later used to develop eLearning modules.
The summary test procedures are provided to guide economies wishing to follow OIML recommendations. They contain abbreviated terms and formulae which are defined in the relevant OIML recommendation.
Information relating to bulk fuel meters:
The summary test procedures are provided to guide economies wishing to follow OIML recommendations. They contain abbreviated terms and formulae which are defined in the relevant OIML recommendation.
Information relating to bulk fuel meters:
SUMMARY OF TEST PROCEDURES USED TO VERIFY CNG DISPENSERS
- These test procedures are based on OIML R 139.
Test Name |
Procedures Description |
Verification of CNG Dispenser |
Process to inspect whether they comply with the approved pattern, to test to ensure that they are operating within the maximum permissible errors and finally to certify by marking them with a seal. |
Test Method |
While gravimetric testing of CNG dispensers is sometimes used for verification, the disposal of the dispensed gas after testing presents a problem and this method of testing requires the transport of heavy and bulky test cylinders and calibrated scales. If a master meter in series with the existing dispenser meter is used to meter the gas into a vehicle, the problem of gas disposal and the need to transport test cylinders and scales can be eliminated. The following information describes the master-meter method of CNG dispenser testing. |
General safety requirements |
Due to the highly flammable nature of the CNG and the movement of vehicles during the test, the following preparation is recommended, as to reduce potential risk, before any testing is commenced:
|
Required equipment |
The following equipment is required to carry out verification of a CNG dispenser.
|
Visual Inspection |
|
Performance test procedure |
|
SUMMARY OF ECONOMY REPORTS
This report is unavailable for CNG Dispensers.
SURVEY RESULTS ON ADOPTING CNG DISPENSERS TEST PROCEDURES
Test name |
Total economies surveyed |
Adopted |
Not implemented |
Economies not responded |
1. Verification of CNG Dispensers |
19 |
13 |
1 |
5 |
2. Test Method |
19 |
13 |
1 |
5 |
3.General safety requirements |
19 |
14 |
1 |
5 |
4. Required equipment |
19 |
13 |
1 |
5 |
5. Visual Inspection |
19 |
14 |
5 |
|
6. Performance test procedure |
19 |
12 |
2 |
5 |
Economies responded
Australia, Canada, Cambodia, DPR of Korea, Hong Kong China, Indonesia, Japan, Malaysia, Mongolia, New Zealand, Singapore, Chinese Taipei, Thailand, Vietnam
Economies not responded
China, Philippines, Papua New Guinea, Republic of Korea, United States of America
Australia, Canada, Cambodia, DPR of Korea, Hong Kong China, Indonesia, Japan, Malaysia, Mongolia, New Zealand, Singapore, Chinese Taipei, Thailand, Vietnam
Economies not responded
China, Philippines, Papua New Guinea, Republic of Korea, United States of America